BOARD POLICY

EFFECTIVE DATE

      Immediate

POLICY NUMBER

#BP-236

 

BOARD OF INGHAM

COUNTY ROAD

COMMISSIONERS

 

 

PREPARING

DEPARTMENT

 Engineering

 

 

SUPERSEDES #

  

RESOLUTION #217-97

SUBJECT:      REPLACEMENT OF DRIVEWAYS AND WALKWAYS

                             ON CONSTRUCTION PROJECTS

 

Driveways and walkways that are altered as a part of an Ingham County Road Commission project will be replaced with the same material used to construct the original facility.  However, if the material is not gravel, bituminous or concrete it shall be at the Road Commission’s discretion as to what material will be used to replace the facility.  The material used to construct the driveway will abut either the roadway pavement or the paved shoulder as long as that portion of the drive that is located in the shoulder of the road follows the normal downward slope of the road shoulder.  If the driveway does not follow the normal slope of the shoulder, the hard surface material will end outside the road shoulder.  All walkways will end at the back of curb or at the shoulder point.  No walkways will extend into the shoulder of the road.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

_____________________________________________________________________________ 

ADOPTED BY THE BOARD OF INGHAM COUNTY ROAD COMMISSIONERS ON SEPTEMBER 4, 1997

 


 

BP-

Page Two