FARM PERMIT
(SENATE BILL NO. 46)
----------------------------------------------------------------------------------------------------
VALID DURING
DURATION OF FROST LAWS
Permit Process:
1.
The applicant must
give the Ingham County Road Commission a 48-hour notice before pickup or
delivery of agricultural commodities from a farm or to a farm. If it is a valid emergency, the permit may
be obtained sooner.
2.
The information the
Ingham County Road Commission shall need in order to determine the fee and
bonding of a permit is as follows:
route, date of move, time of move, frequency of move, weight of load and
what the commodity is to be hauled. If
a bond is required, it must be paid before the permit can be issued. Other information needed to apply for the permit
is as follows: overall width, height
and length of load, license plate number of the vehicle(s) being used and proof
of insurance and registration.
3.
The road commission
shall determine the route and speed to be used, and a time of move shall be negotiated
with the applicant.
4.
It is the applicant’s
responsibility the permit is
obtained and secured in the vehicle transporting the agricultural
commodity.
Permit Fees:
Single Move
Permit: $42.00 – One trip in and
out of a farm loaded in one direction only.
Multiple Move
Permit: $120.00 – Multiple trips
to and from a farm using the same route.
(Permit fee is based on $120.00 per vehicle.)
Road Bond: Fee to be determined by the Ingham County Road Commission.

INGHAM COUNTY ROAD COMMISSION
(517) 676-2200