March 2, 2009

 

 

2009 CONSTRUCTION PROJECTS AND UPDATES


 

WILLIAMSTON ROAD - CITY LIMITS to HASLETT ROAD - install paved shoulder and resurface

City of Williamston limits to Sherwood: STP Small Urban funding.  Sherwood to Haslett: STP Rural funding.  When finished, the project will complete the Ingham County Road Commission’s northern non-motorized paved shoulder loop.  The project involves cold-in-place recycling of the existing asphalt roadway, culvert replacement, and installation of hot mix asphalt over the recycled base, including a paved shoulder.  The roadway will look just like Haslett Road west of Williamston Road.  Bids were received in February 2009 with the work to be performed during the Williamston Public School summer recess.

 

CEDAR STREET - DALLAS AVENUE to HOLBROOK DRIVE - reconstruct with roundabout

Funding provided by the Delhi Township DDA.  The project has been in the planning and plan preparation stage since 1999.  The 2008 work is phase one of a three-phase project to reconstruct Cedar Street from Dallas Avenue to College Road.  The project involves removal of the old concrete roadway, installation of a four lane divided highway with curb & gutter, indirect left turns, new storm sewer, and a modern roundabout at Holbrook Drive. The road reconstruction needs to be coordinated with the Holt Road closure for the Township sanitary sewer project scheduled for May and June.  Cedar Street will be an alternate route for the Holt Road traffic when Holt Road is closed for sewer construction and Holt Road will be an alternate route for the Cedar Street project when construction begins.  Traffic will be maintained on Cedar Street while the road reconstruction project is underway.  The work started in July 2008 and is scheduled to be completed in early 2009.

 

DELHI TOWNSHIP PATHWAY - HOLT ROAD to KELLER ROAD - off-road pathway

Federal Congestion Mitigation & Air Quality funding.  The Ingham County Road Commission is sponsoring the federal Transportation CMAQ grant for the Township because the Township is not eligible to receive the grant money directly.  The money needs to go through an eligible transportation agency per Public Act 51 of 1951.  The project involves installation of a cross-country pathway from Holt Road, just east of Depot Street, to the intersection of Keller Road and Delhi N.E. Street, through Valhalla Park and Maple Ridge Cemetery, to Willoughby Road.  The work started in September 2008 and is scheduled to be completed in early 2009.

 

WAVERLY ROAD – ST. JOSEPH ST. to WILLOW STREET – resurface with watermain installation

The Ingham County Road Commission is partnering with Lansing Township West Side Water System to install new watermain from St. Joseph Street to Michigan Avenue and Saginaw Street to Willow Street and resurface the Waverly Road over the new watermain.  Traffic will be maintained on Waverly Road while the watermain installation and road resurfacing project is underway. We anticipate a May 2009 bid letting with the work to be completed in early 2010.

 

MARSH ROAD – HAMLITON RD. to GRAND RIVER AVE. & HAMILTON RD. – MARSH to OKEMOS – resurface

We anticipate a July 2009 bid letting with the work to be completed shortly afterward.

 

MARSH ROAD - BAKER STREET to the NORTH COUNTY LINE  – resurface

ARRA Stimulus funding.  The Ingham County Road Commission is partnering with the Clinton County Road Commission to resurface Marsh Road from the new concrete pavement near Baker Street, north to BR I-69 (Saginaw Street).  We anticipate an April 2009 bid letting with the work to be completed shortly afterward.

 

HOLT ROAD – BURTON ROAD TO BERYL STREET - resurface

ARRA Stimulus funding.  We anticipate a July 2009 bid letting with the work to be completed in 2009.

 

WAVERLY ROAD – WILLOW ST. TO GRAND RIVER AVE. - resurface

ARRA Stimulus and EFD-F funding.  We anticipate a late 2009 bid letting with the work to be completed in 2010.

 

MARSH ROAD – TIHART ROAD to the RR BRIDGE DECK @ FRANKLIN STREET - resurface

ARRA Stimulus funding.  We anticipate a July 2009 bid letting with the work to be completed in 2009.

 

FEDERAL-AID PREVENTATIVE MAINTENANCE PROGRAM – chip seal

ARRA Stimulus funding.  We anticipate a July 2009 bid letting with the work to be completed in 2009.

•            Bellevue Road – Onondaga Road to the City of Leslie (Hull Road)

•           Barnes Road – College Road to Meridian Road

•           Morton & Heeney Road – Parman Road to M-52

 

OKEMOS ROAD ENHANCEMENT – JOLLY ROAD TO CLINTON STREET. - roadside enhancements.

STP Enhancement funding.  The original enhancement application was submitted October 2004 on behalf of Meridian Township.  The Ingham County Road Commission is sponsoring the federal Transportation Enhancement grant for the Township because the Township is not eligible to receive the grant money directly.  The money needs to go through an eligible transportation agency per Public Act 51 of 1951.  An amendment to the enhancement grant to modify the scope of work and ask for more funding was submitted in January 2007.  At this point, the proposed enhancements no longer involve installation of a median.  They are limited to roadside landscaping including trees, perennials, irrigation, decorative pavement, and lighting.  The revised scope and additional money was approved April 17, 2007.  We anticipate a spring bid letting with the work to be completed in 2009.