March 2, 2009
2009 CONSTRUCTION PROJECTS AND
UPDATES
WILLIAMSTON
ROAD - CITY LIMITS to HASLETT ROAD -
install paved shoulder and resurface
City
of Williamston limits to Sherwood: STP Small Urban funding. Sherwood to Haslett: STP Rural funding. When finished, the project will complete the
Ingham County Road Commissions northern non-motorized paved shoulder loop. The project involves cold-in-place recycling
of the existing asphalt roadway, culvert replacement, and installation of hot
mix asphalt over the recycled base, including a paved shoulder. The roadway will look just like Haslett Road
west of Williamston Road. Bids were
received in February 2009 with the work to be performed during the Williamston
Public School summer recess.
CEDAR STREET -
DALLAS AVENUE to HOLBROOK DRIVE -
reconstruct with roundabout
Funding
provided by the Delhi Township DDA. The
project has been in the planning and plan preparation stage since 1999. The 2008 work is phase one of a three-phase
project to reconstruct Cedar Street from Dallas Avenue to College Road. The project involves removal of the old
concrete roadway, installation of a four lane divided highway with curb &
gutter, indirect left turns, new storm sewer, and a modern roundabout at
Holbrook Drive. The road reconstruction needs to be coordinated with the Holt
Road closure for the Township sanitary sewer project scheduled for May and
June. Cedar Street will be an alternate
route for the Holt Road traffic when Holt Road is closed for sewer construction
and Holt Road will be an alternate route for the Cedar Street project when
construction begins. Traffic will be
maintained on Cedar Street while the road reconstruction project is
underway. The work started in July 2008
and is scheduled to be completed in early 2009.
DELHI TOWNSHIP PATHWAY - HOLT ROAD to KELLER ROAD - off-road pathway
Federal
Congestion Mitigation & Air Quality funding. The Ingham County Road Commission is sponsoring the federal
Transportation CMAQ grant for the Township because the Township is not eligible
to receive the grant money directly.
The money needs to go through an eligible transportation agency per
Public Act 51 of 1951. The project
involves installation of a cross-country pathway from Holt Road, just east of
Depot Street, to the intersection of Keller Road and Delhi N.E. Street, through
Valhalla Park and Maple Ridge Cemetery, to Willoughby Road. The work started in September 2008 and is
scheduled to be completed in early 2009.
WAVERLY ROAD ST. JOSEPH ST. to WILLOW STREET resurface with watermain installation
The Ingham County
Road Commission is partnering with Lansing Township West Side Water System to
install new watermain from St. Joseph Street to Michigan Avenue and Saginaw
Street to Willow Street and resurface the Waverly Road over the new watermain. Traffic will be maintained on Waverly Road
while the watermain installation and road resurfacing project is underway. We
anticipate a May 2009 bid letting with the work to be completed in early 2010.
MARSH ROAD HAMLITON RD. to GRAND RIVER AVE. & HAMILTON RD. MARSH to OKEMOS resurface
We anticipate a July
2009 bid letting with the work to be completed shortly afterward.
MARSH ROAD - BAKER STREET to the NORTH COUNTY LINE resurface
ARRA Stimulus
funding. The Ingham County Road
Commission is partnering with the Clinton County Road Commission to resurface
Marsh Road from the new concrete pavement near Baker Street, north to BR I-69
(Saginaw Street). We anticipate an
April 2009 bid letting with the work to be completed shortly afterward.
HOLT ROAD BURTON ROAD TO BERYL STREET - resurface
ARRA
Stimulus funding. We anticipate a July
2009 bid letting with the work to be completed in 2009.
WAVERLY ROAD WILLOW ST. TO GRAND RIVER AVE. - resurface
ARRA Stimulus and
EFD-F funding. We anticipate a late
2009 bid letting with the work to be completed in 2010.
MARSH ROAD TIHART ROAD to the RR BRIDGE DECK @ FRANKLIN STREET - resurface
ARRA Stimulus
funding. We anticipate a July 2009 bid
letting with the work to be completed in 2009.
FEDERAL-AID
PREVENTATIVE MAINTENANCE PROGRAM chip seal
ARRA Stimulus
funding. We anticipate a July 2009 bid
letting with the work to be completed in 2009.
Bellevue Road Onondaga Road to the
City of Leslie (Hull Road)
Barnes Road College Road to
Meridian Road
Morton & Heeney Road Parman
Road to M-52
OKEMOS ROAD ENHANCEMENT JOLLY ROAD TO CLINTON
STREET. - roadside enhancements.
STP
Enhancement funding. The original
enhancement application was submitted October 2004 on behalf of Meridian
Township. The Ingham County Road
Commission is sponsoring the federal Transportation Enhancement grant for the
Township because the Township is not eligible to receive the grant money
directly. The money needs to go through
an eligible transportation agency per Public Act 51 of 1951. An amendment to the enhancement grant to
modify the scope of work and ask for more funding was submitted in January
2007. At this point, the proposed
enhancements no longer involve installation of a median. They are limited to roadside landscaping
including trees, perennials, irrigation, decorative pavement, and lighting. The revised scope and additional money was
approved April 17, 2007. We anticipate
a spring bid letting with the work to be completed in 2009.